Project Details:
This was a a basement project on an open site that was constructed using a contiguous piled wall method. Due to the need for lateral temporary propping to the pile capping beam, the reinforced concrete lining wall had to be constructed in 2 stages. On this occasion it was more practical to construct the formwork using plywood and timber rather than the standard formwork panels.